Project Overview
CASE successfully delivered its largest cooling tower project for the power plant industry at Venkatesh Iron, Ramgarh. The project was engineered to meet the high cooling demands of large-scale industrial operations.
The RT Series cooling tower handles 4,500 m³/hr of circulating water with a heat rejection capacity of approximately 45 million kcal/hr. The system comprises 3 cells ,12 axial-flow fans, each run by 10-pole motors, providing reliable cooling performance for continuous plant operations.
key Specifications
|
Parameter |
Specification |
|
Water Flow |
4,500 m³/hr |
|
Heat Rejection |
45,000,000 kcal/hr |
|
Inlet Water Temperature |
42°C |
|
Outlet Water Temperature |
32°C |
|
Design Wet Bulb |
28°C |
|
Tower Size |
32.5 ft × 97.5 ft × 11 ft |
|
Fans |
12 × 96″ Axial Flow |
|
Fan Speed |
540 RPM |
|
Motor |
20 HP, 10-pole for each fan |
|
Fill Packing |
PVC Inverted Splash V Bars |
Project Significance
This landmark installation demonstrates CASE’s capability to engineer and deliver high-capacity cooling tower solutions for large-scale power and industrial applications, marking an important milestone in its cooling tower journey.